METLEN Energy & Metals

Production Visibility
with RTLS Digital Twins

The empirical foundation for transitioning from legacy craft production to real-time throughput intelligence.

Explore Proposal

Problem Statement

Information Asymmetry from Non-Realtime Data

Subjective Data Dependency

The current operational model relies on manual, human-reported status updates, leading to Information Asymmetry. Operators lack the incentive to report delays, creating a "lag" in the production lifecycle.

Latency in Anomaly Detection

Without real-time visibility, identifying bottlenecks in the Linear Production Flow occurs only post-mortem, preventing proactive remediation.

Unmeasured Inter-Station Losses

While the "start" and "end" of processes are captured, the "Idle Time" and "Transit Latency" between stations, where the majority of waste occurs remain unmeasured.

Data Fragmentation

Effective ERP environments ("Zed files") require a clean, real-time data stream to facilitate the move toward a standardized SAP S/4HANA/RISE environment.

The LocaXion Solution

Real-Time Visibility & Measurement

Phase 1 RTLS infrastructure focused on Major Product Pieces -- immediate visibility without labor-tracking complexity.

Data Value-Chain

01

LocaXion RTLS

High-precision movement data capture of major assets.

02

Digital Twin

Raw coordinates translated into discrete, location-based KPIs.

03

QNR ERP Integration

Metrics fed into ERP via high-velocity Web Services.

Optional: RTLS data can support validation of McKinsey strategic initiatives, providing empirical proof of productivity gains.

How RTLS Works

From Location Data to Production Intelligence

Ceiling-mounted anchors track tagged assets in real-time. The Digital Twin converts coordinates into actionable KPIs.

Station & Buffer Product Count
1
CUT
1
BUF
1
WLD
1
BUF
1
ASM
0
BUF
1
COT
0
BUF
1
QC
Alerts
All systems nominal
Anchor
Tracked Asset
Station
Buffer Zone
1

Tag & Detect

UWB tags on products transmit signals to ceiling-mounted RTLS anchors.

2

Locate & Map

Positions are mapped to station and buffer geofences across the production floor.

3

Analyze & Push

Digital Twin calculates KPIs from zone transitions, dwell times, and buffer queues, then pushes to ERP.

Key Performance Indicators

Strategic Levers for All Main Products

Phase 1 delivers automated reporting on five strategic KPIs designed to surface hidden inefficiencies.

Throughput Velocity Index (TVI)

Rate at which a product traverses the end-to-end value stream. Real-time progression through defined "Linear Gates".

Utility
Identifies "true" line speed

Automated Cycle Time Variance (ACTV)

Delta between real-time station occupancy and "Standard Work" allotment. Automated "Takt-time" tracking in and outside geofences.

Utility
Identifies friction in takt or process planning

WIP Aging & Stagnation Alerting

Identification of assets exceeding 2-sigma dwell time in any NVA (non-value add) zone.

Utility
Identifies unplanned delays

Inter-Process Latency (IPL)

Measurement of transit time between production stages.

Utility
Identifies crane logistics friction and shared-operator conflicts

Process Heatmap

Heat-map visualization of asset accumulation within the linear flow.

Utility
Identifies accumulation beyond planned times

Basic Metrics

01WIP Dwell Time by Zone
02End-to-End Lead Time (Gate-to-Gate)
03Touches / Moves Count
04Distance Traveled (Proxy)
05Queue Time vs Work Time
06On-Time Progress Against Plan
07WIP Aging
08Yard Exposure Time
09Bottleneck Heatmap

Advanced Analytics

1

Flow Stability Score

Measures how often WIP returns to prior zones (rework loops, missing parts, failed inspection). Outputs loop count per unit and flow stability index.

2

Hidden WIP / Dark Inventory

Assets stationary too long in non-approved or "orphan zones." Surfaces count, hours, and cost tied up in misplaced inventory.

3

Critical Path Loss Attribution

For each unit, identifies the single biggest time-loss event. Turns RTLS into a schedule truth engine.

Investment

Rough Order of Magnitude

Phase 1 investment breakdown. All figures subject to site survey and scope confirmation.

CategoryLine ItemDescriptionQtyUnit PriceTotal
Hardware
UWB RTLS Anchors
Industrial-grade ceiling-mounted anchors
TBD
TBD
TBD
|
UWB Asset Tags
Rugged tags for major products (IP67)
TBD
TBD
TBD
Infrastructure
Network & Cabling
PoE switches, Ethernet, mounting hardware
1
TBD
TBD
Software
Digital Twin Platform
Location engine, geofencing, KPI dashboards
1
TBD
TBD
|
ERP Integration Module
Web Services API connector to QNR / SAP
1
TBD
TBD
Services
Site Survey & Calibration
On-site assessment, anchor planning, calibration
1
TBD
TBD
|
Deployment & Commissioning
Hardware install, config, testing
1
TBD
TBD
|
Training & Knowledge Transfer
Operator + admin training, documentation
1
TBD
TBD
Recurring
Annual Platform License
Digital Twin SaaS subscription
1
TBD
TBD
|
Support & Maintenance
Technical support, firmware updates, monitoring
1
TBD
TBD
Total InvestmentTBD
All figures in USD unless otherwise stated. Final pricing subject to site survey results.

Timeline

16-Week Deployment Plan

From site survey to go-live. Drag bars to adjust in edit mode.

Planning
Procurement
Infrastructure
Deployment
Software
Integration
Testing
Training
Go-Live
Task
W1
W2
W3
W4
W5
W6
W7
W8
W9
W10
W11
W12
W13
W14
W15
W16
Month 1
Month 2
Month 3
Month 4
Site Survey & Assessment
Site Survey & Assessment
Spatial Calibration & Design
Spatial Calibration & Design
Hardware Procurement
Hardware Procurement
Network Infrastructure
Network Infrastructure
Anchor Installation
Anchor Installation
Digital Twin Configuration
Digital Twin Configuration
Geofence & KPI Setup
Geofence & KPI Setup
ERP Integration (QNR)
ERP Integration (QNR)
Testing & Validation
Testing & Validation
Training & Knowledge Transfer
Training & Knowledge Transfer
Go-Live & Hypercare
Go-Live & Hypercare